Questions & Answers
When should I replace my roof?
You should have your roof checked for drying and cracking if the roof is
between 20 and 25 years old. Most shingles on the market today have a minimum 25-year
warranty. Roofs wear differently depending how steep your roof is or how much
sunlight your roof receives. Having your roof checked sooner rather than later
can save you money.
What kind of shingle materials are available?
There are many different kinds of shingles on the market today.
We use only the top rated materials on the market. Some of the most widely available
shingles are the Owens Corning 30-year Duration or the Owens Corning Lifetime Duration.
Call Dick’s Roofing to see samples.
Is there a leak by my chimney?
Many roof leaks come from the chimney area. Most of the leaks are a result of
flashings pulling away from the chimney. In most cases this can be fixed by
applying rubber silicon to the chimney flashing. In worse cases the flashings may
need to be replaced.
Is there a leak in my valley?
The valley is the most important area on a roof that needs to be protected.
The valley in most cases is the first area on a roof to wear out, because of how
much water passes over it. Some valleys may leak, because they are installed
wrong. Some valleys can be replaced without having to replace the entire roof.
Some valleys that are leaking may be signs that your roof may need to be replaced.
How many layers of roofing can I have on my home?
The State of Wisconsin allows only two layers of shingles on a home. If your
home has two or more layers on it you will need to have a tear-off. Dick’s
Roofing can give you a few different options of tearing off. In some cases you
can remove just one layer of roofing depending on the condition of the shingles.
Give Dick’s Roofing a call for an expert opinion.
What if I have wood shingles?
Dick's Roofing can remove all wood shakes and install new 1/2" plywood to
the roof surface. When removing wood shakes in most cases, new chimney flashings
and gutter flashings will also need to be replaced.
How long will it take to roof my home?
In most cases, your roof should be completed in two days. This depends on the
size of the job. When we begin a roof job, we continue the same job until it is
finished. We believe in finishing the work we have started before we begin our
next roof.
What if I need new gutters?
Dick’s Roofing installs seamless aluminum 5" gutters and 3 x 4"
downspouts. We also provide leaf guards.
What if I need a new chimney flashing?
Dick’s Roofing uses only the best quality chimney flashings on the market today.